Project Details

  1. Home
  2. Projects

DEWA Substation GRC Facade Project Dubai

DUBAI

The DEWA Substation project is a GRC facade and cladding project that supports critical power infrastructure in Dubai. The scope includes the installation of GFRC panels with high-quality finishing, designed to enhance durability, protection, and architectural appearance of the substation facility.

Built to meet strict performance and safety standards, the project reflects reliable execution for infrastructure developments, ensuring long-term performance in demanding operational environments. Dubai Electricity and Water Authority substations play a key role in electricity transmission and network reliability across Dubai, supporting continuous urban and industrial growth